Overview
Canary Wharf is a London Underground station at Canary Wharf and is on the Jubilee line, between and stations. The station is located in Travelcard Zone 2 and was opened on 17 September 1999 as part of the Jubilee Line Extension. Over 40 million people pass through the station each year, making it second busiest on the London Underground outside Central London after Stratford, and also the busiest that serves only a single line.
History
Before the arrival of the Jubilee line, London's Docklands had suffered from relatively poor public transport. Although the Docklands Light Railway station at Canary Wharf had been operating since 1987, by 1990 it was obvious that the DLR's capacity would soon be reached. The Jubilee line's routing through Canary Wharf was intended to relieve some of this pressure.
The tube station was intended from the start to be the showpiece of the Jubilee Line Extension, and the contract for its design was awarded in 1990 to the architect Sir Norman Foster. It was constructed, by a Tarmac Construction / Bachy UK Joint Venture, in a drained arm of the former dock, using a simple "cut and cover" method to excavate an enormous pit 24 metres (78 ft) deep and 265 metres (869 ft) long. The size of the interior has led to it being compared to a cathedral, and it has even been used to celebrate a wedding. Foster based the design upon previous work done for the Bilbao metro, colloquially named "Fosteritos". However, the main reason for the station's enormous dimensions was the great number of passengers predicted; as many as 50,000 daily. It remains the only tube station to accommodate rush hour demand. These predictions have been outgrown, with as many as 69,759 on weekdays recorded in 2006 and within a decade it had become the only station outside of Zone 1 to be ranked within the top-ten most used stations.
Canary Wharf station and the Jubilee line Extension itself were partly funded by the owners of the Canary Wharf complex, to make it more accessible to commuters. The Canary Wharf group had committed to £500 million of funding for the capital costs, over 24 years. They were, however, underwhelmed by the proposed service frequency. Only five years after the construction of the extension, capacity issues started becoming apparent and upgrades were required. The first step was the lengthening of the trains from 6 to 7 cars. This was done at the end of 2005.
From Wikipedia (CC BY-SA 4.0).