The M3 line, also referred as Menderes–Konak Line (Turkish: Menderes–Konak Hattı) is a planned ATO rapid transit line in İzmir, Turkey. The line has a total length of 22.3 km (13.9 mi) and would begin at Konak and run south into Menderes. When completed, the line will become the second driverless metro line in İzmir, after the M2 line.
Contents
History
A tender was awarded in December 2019 for the implementation of the project of the line. The introductory meeting of the line, which will cost 2.105 billion euros, was held on 31 January 2023.
Stations
The line will consist of eighteen stations, of which fifteen are new and three (Fuar İzmir, General Asım Gündüz and Konak) will connect to the existing lines. The list of stations are as follows:
Menderes
Görece
Menderes Sanayi
Adnan Menderes Airport
Gaziemir Güvenpark
Gaziemir Stadyum
Abdullah Arda
Gaziemir Kaymakamlık
ESBAŞ
Fuar İzmir
Altan Aydın
Atatürk Anadolu TML
Dostluk Bulvarı
Seniha Mayda
Eski İzmir
Çalıkuşu
General Asım Gündüz
Konak