Overview
The Red Line of IndyGo is a bus rapid transit line serving parts of central, northern, and southern Indianapolis. The first phase of this transit route entered service on September 1, 2019, and was originally free for the first month; the free service was extended to the second and third months due to problems with the fare collection system. The Red Line links Broad Ripple to the University of Indianapolis via Downtown Indianapolis.
History
On May 31, 2018, IndyGo began construction of the Red Line, the city's first Bus Rapid Transit (BRT) line. The first phase of the system opened on September 1, 2019, after about 15 months of construction and testing. The $96.3 million project included a $75 million grant from the Federal Transit Administration. Two additional BRT lines (Purple Line and Blue Line) are presently planned, along with proposed extensions on both ends of the Red Line. The Red Line has been assigned IndyGo Route #90.
The Red Line serves Marion County with eventual service extensions planned to County Line Road/Madison Avenue at the southern boundary with Johnson County and a still undetermined alignment to the northern boundary with Hamilton County. A Johnson County extension to Smith Valley Road in Greenwood has been approved with early design work funded. A Hamilton County extension to Grand Park in Westfield has been proposed with early design work funded.
From Wikipedia (CC BY-SA 4.0).