BP Silver Reports 441 g/t Silver Discovery

BP Silver reported its first two drill-hole results from the Jalsuri Northeast target at Bolivia’s Cosuño Silver Project, describing the find as the project’s third discovery. Hole CO-0023 returned 12 meters grading 441 grams per metric ton silver, including one meter at 2,620 grams per metric ton—the highest silver grade drilled at Cosuño to date—while CO-0022 intersected seven meters at 194 grams per metric ton. The holes also indicate continuity of silver mineralization, with grades increasing at depth, and broad zinc zones adjacent to the high-grade silver intervals. Jalsuri Northeast is a roughly one-kilometer-long structural zone, and the mineralization remains open along strike and at depth; reported intercepts are core lengths, with true widths not yet determined.






