Malaysia Airlines orders Boeing 787s to replace Airbus A350 fleet

Malaysia Aviation Group has ordered 10 Boeing 787 Dreamliners, with options for six more, to modernize Malaysia Airlines’ long-haul fleet. The 787-10s, powered by GE Aerospace engines, are scheduled for delivery from 2032 to 2035, as the airline phases out its seven Airbus A350s. The aircraft are intended to add capacity and flexibility on international routes, including destinations in Europe and the Asia-Pacific, and will make Malaysia Airlines the first Malaysian carrier to operate the Dreamliner.






