Oklahoma River Basin Drains for 632-Foot Bridge
Oklahoma City plans to drain a section of the Oklahoma River beginning in December to prepare for construction of a 632-foot-long, 30-foot-wide pedestrian bridge near the RIVERSPORT campus. The bridge will connect the north and south Rivershore Trails and include illuminated pathways, decorative handrails and a large arch. While the basin is drained, crews will also remove sediment and upgrade a sewer main; rowing at the Boathouse District will pause, though other local rowing spots will remain available. The $32.3 million project is funded by a federal BUILD grant, city bond funds and the Oklahoma Department of Transportation, and the basin is expected to refill in spring 2027.





