Think Free
The IJR Daily
Your front page, in your inbox — trending stories picked for you every morning, plus the big ones as they break.
Free, no account needed. Unsubscribe anytime.
During a historic Chicago heat wave, the DuSable Lake Shore Drive bridge temporarily remained raised after a scheduled lift, disrupting downtown traffic. Crews and a Fire Department water-spray operation cooled the steel, allowing the bridge to close and the roadway to reopen in mid-afternoon, with detours in place. Officials cited heat-related expansion of metal components, and noted the bridge’s aging, previously deficient status. The incident followed a pattern of heat-related issues across Chicago’s movable bridges, including nearby Calumet River crossings. City officials said there were no injuries and called for ongoing scrutiny of maintenance and tolerances. Inspections in 2024 had flagged the DLSD bridge as structurally deficient and functionally obsolete, highlighting long-standing concerns about aging urban infrastructure.
Where do you stand?
How it spread
What each side asserts, disputes — or leaves out entirely.
Whose framing of this story rings truest to you?
Center· 5 sources
“Chicago River bridge gets stuck after lifting for boat to pass”Right
Free account · your comment posts right after signup
Glad they got it closed before it caused a bigger mess, but this is going to keep happening as summers get hotter.
If it was already flagged as deficient before this happened, someone dropped the ball on maintenance funding.
Classic Chicago summer problem, but you'd think they'd have a better system than firefighters hosing down a bridge to make it work.